The contractors pulled off the basement wall forms and the plumber arrived to rough in the plumbing for the basement bathroom and the sewer lift pump. It is a good thing that Gary knows construction, because the day before the pour, he noticed the plumber had not put in the drain for the basement shower. This would have been a huge problem if the floor was poured, without the shower drain.
No comments:
Post a Comment