Monday, September 15, 2014

Foundations complete, Basement Walls next


 After the footings have cured, the contractor started the process of forming the basement walls.  We have to wait in line for concrete, which comes from Billings, over 70 miles away.  It takes about a week to get on the list for concrete delivery.  At this point, the house is looking bigger than expected.  Yikes, what were we thinking.  When it was just stakes in the ground, it looked smaller than expected.  I hope that means when it is finished,  it will feel just the right size.




No comments:

Post a Comment